The primary park has a capability of 200 MW although Sandrini II contains a capacity of 100 MW. The overall expense of each assignments were not disclosed however, during construction, above 200 workers were being used. The initiatives are predicted to see A few positions opening up for everlasting operations. https://californiasolarcontractors.art.blog/2024/11/26/how-to-start-solar-energy-system-installation-with-a-california-solar-company/